Thông tin chi tiết sản phẩm:
Thanh toán:
|
Max weight: | 50T | Material: | Steel |
---|---|---|---|
Forging ratio: | ≥3.5 | Heat treatment: | N+T Q+T |
Forging equipment: | 8000T open die hydropess | Size: | As drawing |
Điểm nổi bật: | turbine rotor forging,steam turbine shaft |
Industrial Steam Turbine Rotor Forging Steel Water Turbine Main Shaft
1, Products:
water turbine main shaft,hydro generator main shaft
2, Products reference
Material | 20SiMn,1045,35SiMn,4140 |
Forging equipment | 8000T open die hydropress |
Application |
Hydro generator can transfer mechanical energy ino electric energy by generator rotor |
Melting process | EF+LF+VD |
Production process |
Forging+heat treatment+rough machining+finish machining |
Forging ratio |
≥3.5 |
Applicable standard | ASTM,ASME,DIN,JIS,ISO,BS,API,EN |
Executive standard | JB/GB/EN/DIN/JIS/ASME/ASTM/ISO |
Certification authority | ISO9001:2008,BV,SGS, IST, UL,CTI |
Delivery term |
Rough machining(N+T);finish machining(Q+T) |
Test equipment |
Spectrograph,UT devivce,tensile and compact test machine,metalloscope,outside micrometer,bore dial indicator,hardness test machine |
Service | Our service included the forging, process, heat treatment, finish machining, package, local logistics, customers clearance and maritime transport. We took the customer’s requirements as the principal thing, and pay attention on the products quality. |
3, Custom properties
Material elements | C | Si | Mn | P | S | Cr | Ni | Mo |
Others |
20SiMn | 0.16-0.22 | 0.60-0.80 | 1.00-1.30 | ≤0.035 | ≤0.035 | ≤0.30 | ≤0.30 | -- | - |
1045 | 0.42-0.50 | 0.17-0.37 | 0.50-0.80 | ≤0.035 | ≤0.035 | ≤0.25 | ≤0.30 | -- | |
4140 | 0.38-0.43 | 0.15-0.35 | 0.75-1.00 | ≤0.035 | ≤0.040 | 0.80-1.10 | - | 0.15-0.25 | -- |
Mechanical property |
Dia.(mm) |
TS/Rm(Mpa) |
YS/Rp0.2(Mpa) |
EL/A5(%) |
RA/Z(%) |
Type Of notch |
Impact energy |
HBW |
|
20SiMn | Ø15 | ≥450 | ≥255 | ≥14 | -- | U | ≥39 | ||
1045 | Ø25 | ≥600 | ≥355 | ≥16 | ≥40 | V | ≥39 | ≤229HBS | |
4140 | Ø10 | 740~1000 | 450~850 | ≥12 | ≥25 | V | ≥40 | ≤250HBS |
4, Process procedure:
Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipment
5, Commerce clause
Max weight | 50T |
MOQ | 1PC |
Delivery time | 30-50 Days |
Package | wood pallet,steel frame |
Delivery term | FOB;CIF;CFR;DDU; |
Payment term | T/T,LC |
Type of shipping |
By ocean,air |
6, Keywords:
Water turbine main shaft is the key parts of hydro electric installation,utilize water power to rotate water turbine,by means of connection of water turbine main shaft,magnet yoke,thrust block,other key components as well.transfter water energy into mechanical energy,If connect generator to water turbine,as water turbine rotate it will generate electric power,meanwhile mechanical energy transfer into electrical energy
Features:
Người liên hệ: Mr. Arnold
Tel: +86-15-15-15-81-878
Fax: 86-512-58360318